After visiting the site of tunnel inside which 41 labourers have been trapped after it collapsed on November 12, Dhami said that auger machine that was involved in drilling through the debris from Silyara side is expected to be pulled out till tomorrow morning after which manual drilling will begin.

from India News https://ift.tt/Jb906uQ
via IFTTT